Location
Athens
Space Size
50 m2
Year of Construction
2021
In the process of shaping and upgrading the CT scan room at Sotiria Hospital, the following tasks have been carried out:
- Dismantling and removal of all unnecessary materials
- Construction of new plasterboard fire-resistant walls
- Implementation of the radiation protection study of the CT scan room
- Structural adequacy and new structural study for the placement of the new CT scanner
- Construction of a special floor base to host the new machine
- Installation of antistatic pvc floors of excellent quality
- Construction of false ceilings made of a specific antimicrobial material suitable for healthcare spaces
- Construction of special radiation-proof metal doors
- Construction of required infrastructure and repositioning of existing lead glass window
- Conduct of extra electromechanical work based on the space needs
- Perform paintwork according to the new layout of the space