Location
Kifissia – Athens
Space Size
45 m2
Year of Construction
2020
For the preparation of the installation site for the new cyclotron at the General Oncological Hospital of Kifissia, the following tasks have been executed:
- Dismantling and removal of all unnecessary materials
- Construction of a special bearing base to host the new machine following the static study and the guidelines of the supplier.
- Construction of new plasterboard walls
- Installation of new pvc flooring
- Installation of new wooden doors
- Installation of new double sliding aluminum window frame according to the study
- Construction of a new acoustic plasterboard ceiling
- Execution of additional electromechanical works according to the needs of the site and its machinery
- Installation of a new wall air conditioning unit
- Perform paintwork according to the new layout of the space