GENERAL HOSPITAL OF NEA IONIA – KONSTANTINOPOYLEIO – PATISION

Location
N.Ionia - Athens
Space Size
105 m2
Year of Construction
2020

At the General Hospital of N.Ionia the existing material warehouse was separated, the space was configured to installation the new Coronary Angiography and the sterilization department of material was renovated according with the modern standards.

To achieve all the above, the following tasks have been executed:

  • Dismantling and removal of all unnecessary materials
  • Structural adequacy and new structural study for the placement of the new machine unites
  • Construction of a special bearing base to host the new machines
  • Installation of new pvc flooring
  • Construction of new plasterboard walls
  • Conduct of a radiation protection study
  • Installation of new lead glass window that is equivalent with 2,50mm Pb
  • Installation of special metal radiation protection doors
  • Installation of wall linings made of suitable antimicrobial material inside the sterile material warehouse
  • Installation of new bathroom fittings at the WC space
  • Construction of special suspension system for roof machinery
  • Construction of a metal suspension system for lighting fixtures and air conditioning vents
  • Installation of a metal structure to support new doors and their frames
  • Construction of a new suspended ceiling made of mineral fibers
  • Construction of a new suspended ceiling from panels similar to the antimicrobial lining used in the sterilization area
  • Installation of sliding and opening metal doors and connection of all their automations
  • Installation of new workbenches and additional auxiliary furniture in the control room and the warehouse area.
  • Execution of additional electromechanical works according to the needs of the site and its machinery
  • Perform paintwork according to the new layout of the space