GENERAL HOSPITAL "SOTIRIA"

Location
Athens
Space Size
-
Year of Construction
-

The works carried out in order to put in full function a 10-bed Intensive Care Unit and a 0-bed Enhanced Therapy Unit at the “Elena Venizelou” Hospital are the following:

  • Cleaning and maintenance of 4 central air-conditioning units
  • Cleaning, maintenance and proper operation control of local indoor FCU type air conditioning units
  • Maintenance and proper operation control of existing ventilation units
  • Repair of 3 compressors that produce medical compressed air
  • Repair of 3 water pumps
  • Repair of all oxygen, vacuum and air intake networks
  • Execution of electrical work
  • Replacement of the nurse call system
  • Upgrading of various automation systems
  • Carrying out local restoration work on floors, ceilings and walls
  • Perform paintwork according to the new layout of the space