Location
Nikaia - Athens
Space Size
80 m2
Year of Construction
2020
For the configuration of the new OR at the General State Hospital of Nikaia, the following tasks have been carried out:
- Measure taking in order to prevent the transmission and spread of dust and bacteria due to building and electromechanical works
- Dismantling and removal of all unnecessary materials
- Construction of new plasterboard walls
- Installation of special antimicrobial linings suitable for hospital premises
- Construction of suspended ceiling made from plasterboard suitable for operation rooms
- Installation of antistatic PVC floor and conductivity check for the floor of the operation room
- Placement of new wooden doors and installation of a new modern automatic mechanism for the operation room door
- Installation of new scrub up sinks in the entry of the operating room made of a Corian-type homogenous material
- Installation of auxiliary cabinets
- Installation of an updated heating, air-conditioning and ventilation unit
- Installation of new medical gas networks
- Execution of electromechanical work