‹ Back

ΑΤΤΙΚΟ ΝΟΣΟΚΟΜΕΙΟ

Location
Athens
Space Size
-
Year of Construction
-

For the preparation of the installation sites of the new MRI scanner at Aretaeion Hospital, the following tasks have been carried out:

  • Dismantling and removal of all unnecessary materials
  • Installation of antistatic pvc floors of excellent quality
  • Construction of new plasterboard suspended ceilings
  • Construction of new plasterboard walls
  • Restoration of existing walls
  • Installation of special metal radiation protection doors
  • Placing of new amagnetic furniture in the control room
  • Elaboration of new structural study for the placement of the MRI scanner
  • Construction of a special floor base to host the new machine
  • Construction of a new access ramp towards the technical and the control room
  • Installation of sound insulation on ceilings
  • Installation of new wooden doors
  • Conduct of extra electromechanical work based on the space needs
  • Perform paintwork according to the new layout of the space