ARETAEION HOSPITAL

Location
Athens
Space Size
136 m2
Year of Construction
2022

For the preparation of the installation sites of the new MRI scanner at Aretaeion Hospital, the following tasks have been carried out:

  • Dismantling and removal of all unnecessary materials
  • Installation of antistatic pvc floors of excellent quality
  • Construction of new plasterboard suspended ceilings
  • Construction of new plasterboard walls
  • Restoration of existing walls
  • Installation of special metal radiation protection doors
  • Placing of new amagnetic furniture in the control room
  • Elaboration of new structural study for the placement of the MRI scanner
  • Construction of a special floor base to host the new machine
  • Construction of a new access ramp towards the technical and the control room
  • Installation of sound insulation on ceilings
  • Installation of new wooden doors
  • Conduct of extra electromechanical work based on the space needs
  • Perform paintwork according to the new layout of the space