NATIONAL BLOOD DONATION CENTER

Location
Acharnes - Athens
Space Size
150 m2
Year of Construction
2020

For the configuration of the new laboratory of the National Blood Center, the following tasks have been carried out:

  • Dismantling and removal of all unnecessary materials
  • Construction of new plasterboard walls
  • Construction of a new suspended ceiling made of mineral fibers
  • Installation of new PVC flooring of excellent quality
  • Reinforcement of a metal roof frame of the load-bearing structure of the building for the installation of new air-conditioning units
  • Installation of new aluminum window frames
  • Construction of new workbenches, cabinets other auxiliary laboratory furniture
  • Execution of electrical work
  • Execution of plumbing work
  • Installation of new modern air-conditioning units and of a new ventilation system
  • Perform paintwork according to the new layout of the space